(+44) 01223 926 335 Mon–Fri : 09:00 – 17:30
info@liongateconstruction.co.uk
(+44) 01223 926 335 Mon–Fri : 09:00 – 17:30
info@liongateconstruction.co.uk

Office-to-Residential Conversion, Newport: Refuse Vehicle Swept Path Update

Newport · Appointed

Office-to-Residential Conversion, Newport: Refuse Vehicle Swept Path Update

Swept Path Analysis

Illustrative image, not the actual site: a white refuse lorry in a car park beside a fenced communal bin store, with a worker in high-visibility clothing and a hard hat signalling, and a multi-storey building in the background.

Illustrative image — not the actual project design.

Liongate has been appointed to update the refuse vehicle swept path analysis for an office-to-residential conversion in Newport, following revisions to the scheme's parking and refuse storage layout.

Our appointment

The scheme converts the upper floors of a former office building in Newport into residential flats, with the ground floor used as a residents-only gym and storage area.

The latest revisions to the architect's site and ground floor plans change the parking and refuse storage arrangements. A swept path analysis was previously prepared for waste collection at the site, and it now needs to be brought up to date to reflect the revised layout.

Our role is to model the movement of a refuse collection vehicle serving the revised bin store, checking the manoeuvre against the latest proposed site layout and ground floor plan.

The work is currently in progress following our appointment.

Need support with your project?

Share your site details, planning requirements and available drawings with our team.

Discuss your project