Can cycle and bin storage be covered together?
Yes. We can coordinate both within one brief where your permission requires them. The quotation identifies the conditions and deliverables covered.
Which cycle parking standards apply?
We check the relevant local planning requirements and the wording of your permission. For London projects, the London Plan and London Cycling Design Standards inform the assessment where applicable.
How much bin storage is needed?
This depends on the development, the waste streams and collection arrangements. We use the relevant council guidance rather than applying one capacity figure to every project.
Can you change the layout shown on approved plans?
We can assess options, but a material change to an approved layout may need separate planning consideration. We flag this before the scope is agreed.
Does the fee include submission and later amendments?
Your quotation states what is included. Application handling, council fees and any later changes are clarified before you appoint us.
How long does it take, and is approval guaranteed?
We confirm the preparation programme once we have reviewed the information. Council review is separate, and the decision remains with the local planning authority.
Applicable guidance: London Plan — cycling and cycle parking; the relevant council’s parking and waste guidance.