STARTING PRICE
£750 + VAT
The final fee reflects project complexity and the agreed requirements.
REPORTING CONSULTANCY · UK COVERAGE
Plan deliveries and servicing arrangements for the operational phase of your development.
Final scope, fee and programme are confirmed for your project.

UNDERSTAND YOUR REPORT
Plan deliveries and servicing arrangements for the operational phase of your development.
A Delivery and Servicing Plan (DSP) is a document required by UK councils — particularly London boroughs — as a planning condition, setting out how deliveries, servicing and waste collections will be managed once a development is occupied. It covers delivery frequencies and timings, loading and unloading arrangements, refuse and recycling collections, and measures to reduce the impact of servicing traffic on the surrounding streets, such as consolidating deliveries and avoiding peak hours. A DSP is often required alongside a Travel Plan. For managing vehicles during the build itself, see our Construction Logistics Plan (CLP) service.
At Liongate, we specialize in preparing Delivery and Servicing Plans with a team of expert consultants. They efficiently handle the development of DSPs and skillfully manage the discharge of servicing-related planning conditions set by councils. Our consultants, experienced in transport planning and building operations, ensure that each DSP meets the council’s requirements and keeps servicing traffic manageable for the surrounding community, facilitating a compliant and successful development.
FEE, PROGRAMME & COVERAGE
A clear starting point for your report. Your quotation confirms the scope, final fee and preparation programme.
STARTING PRICE
£750 + VAT
The final fee reflects project complexity and the agreed requirements.
PREPARATION
1–2 weeks
Typical preparation, subject to the required project information. Any external review is separate.
COVERAGE
UK-wide
Consultants with experience supporting projects across UK council areas.
Send the project brief, relevant requirements and available drawings so the scope can be established.
PROJECT EXPERIENCE
In South London, our team at Liongate prepared the Delivery and Servicing Plan for the 151-157 Eardley Road scheme with Alozie Architects, as part of a wider package for Wandsworth Council that also included the site’s Construction Management Plan and Construction Environmental Management Plan.
Preparing the DSP alongside the construction-phase documents kept the delivery, servicing and waste collection arrangements consistent from build through to occupation — exactly the joined-up picture councils want to see when discharging conditions.



THE PEOPLE BEHIND THE REPORTS
Engineering knowledge and practical project experience across the UK, with a team you can speak to.
SELECTED REPORTING PROJECTS
BEFORE YOU START
Share the site address, project description, relevant requirements and available drawings. Tell us about your target dates.
The starting fee is a guide. Your quotation sets out the deliverables, project inputs, final fee and any separate surveys or specialist work. Revision arrangements should also be confirmed in the quotation.
The typical preparation period is one to two weeks. The actual programme depends on scope, information availability and any required surveys. External review periods are separate.
LET’S REVIEW YOUR REQUIREMENTS
Send the site address, planning condition and available drawings. We’ll use your enquiry to establish the report scope and quotation.