(+44) 01223 926 335 Mon–Fri : 09:00 – 17:30
info@liongateconstruction.co.uk
(+44) 01223 926 335 Mon–Fri : 09:00 – 17:30
info@liongateconstruction.co.uk

21 Church Lane Project

Project Description

Location: 21 Church Lane, Barnet
Authority: London Borough of Barnet
Status: Conditions discharged

A residential development delivered with ZETA Property on a tight corner plot where every vehicle movement had to be proven before the council would sign off.

Liongate's Services

Liongate prepared the Construction Management and Logistics Plan supported by a dedicated Vehicle Manoeuvrability Plan. Liongate-produced swept path drawings demonstrated ingress and egress for construction vehicles, proving they could enter, turn and leave the site safely without over-running footways or neighbouring accesses.

Pairing the management plan with accurate vehicle tracking drawings is often the fastest way to satisfy a highways condition — the plan explains the strategy, and the drawings prove it works on the ground.

Documents prepared:

Share This Project