(+44) 01223 926 335 Mon–Fri : 09:00 – 17:30
info@liongateconstruction.co.uk
(+44) 01223 926 335 Mon–Fri : 09:00 – 17:30
info@liongateconstruction.co.uk

3 New Close Project

Illustrative scene for 3 New Close Project
Illustrative image — not a photograph or design of this project.

Report example

A cover from the documentation prepared for this project.

Report cover — 3-new-close-cover

Project Description

Location: Merton, London
Authority: Merton Council
Status: Conditions discharged

A residential development at 3 New Close delivered with Londex Property, with a Construction Logistics Plan required before works could begin.

Liongate's Services

Liongate prepared the Construction Logistics Plan covering vehicle routing, delivery scheduling and holding areas, aligned with CLOCS principles and the council’s highway requirements.

Documents prepared:

Share This Project