
Location: Wimbledon, London
Authority: Merton Council
Planning ref: 25/P2110
Status: Conditions discharged
A substantial scheme at St George’s House West in Wimbledon with Nick Smith Construction & Shopfitting, carrying logistics, environmental and method-statement conditions together.
Liongate prepared the scheme’s full pre-commencement set: the Construction Logistics Plan, Construction Environmental Management Plan and Construction Method Statement — one consistent story across all three documents.
Documents prepared: