(+44) 01223 926 335 Mon–Fri : 09:00 – 17:30
info@liongateconstruction.co.uk
(+44) 01223 926 335 Mon–Fri : 09:00 – 17:30
info@liongateconstruction.co.uk

Land at Third Drove Project

Project Description

Location: Third Drove, Cambridgeshire
Authority: Cambridgeshire
Status: Conditions discharged

A battery energy storage (BESS) scheme developed with Cambridge Power on open land where ecology and biodiversity sat at the centre of the planning conditions.

Liongate's Services

Liongate prepared a biodiversity-focused Construction Environmental Management Plan alongside the site-specific Construction Management Plan. Habitat protection zones, timing restrictions and working-method controls were built directly into the construction strategy, together with long-term enhancement measures for the site.

Energy infrastructure projects live or die by their environmental compliance — integrating the ecological requirements into the construction documents from day one kept the scheme moving.

Documents prepared:

Share This Project