REPORTING CONSULTANCY · UK COVERAGE
Set out the management of site waste, materials and recycling during the works.
Final scope, fee and programme are confirmed for your project.

UNDERSTAND YOUR REPORT
Set out the management of site waste, materials and recycling during the works.
A Site Waste Management Plan (SWMP) is a document required by many UK councils as a planning condition, setting out how construction and demolition waste will be managed. It estimates the types and quantities of waste the project will produce, sets out how waste will be reduced, reused and recycled, and records how remaining waste will be removed by licensed carriers to appropriate facilities. Waste arrangements are also commonly required as part of a wider Construction Environmental Management Plan (CEMP).
At Liongate, we specialize in preparing Site Waste Management Plans with a team of expert consultants. They efficiently handle the development of SWMPs and skillfully manage the discharge of waste-related planning conditions set by councils. Our consultants, experienced in construction planning and environmental management, ensure that each SWMP meets the council’s requirements and keeps waste handling practical for the site team.
FEE, PROGRAMME & COVERAGE
A clear starting point for your report. Your quotation confirms the scope, final fee and preparation programme.
STARTING PRICE
£750 + VAT
The final fee reflects project complexity and the agreed requirements.
PREPARATION
1–2 weeks
Typical preparation, subject to the required project information. Any external review is separate.
COVERAGE
UK-wide
Consultants with experience supporting projects across UK council areas.
Send the project brief, relevant requirements and available drawings so the scope can be established.
PROJECT EXPERIENCE
In Watford, our team at Liongate prepared the Site Waste Management Plan for works at the National Animal Welfare Trust site with Drake and Partners Building Consultancy — part of a wider package that also covered the demolition and construction environmental management and dust control documentation.
Handling the waste, environmental and dust requirements together kept the documents consistent and gave the council a single joined-up picture of how the site would be managed.


THE PEOPLE BEHIND THE REPORTS
Engineering knowledge and practical project experience across the UK, with a team you can speak to.
SELECTED REPORTING PROJECTS
BEFORE YOU START
Share the site address, project description, relevant requirements and available drawings. Tell us about your target dates.
The starting fee is a guide. Your quotation sets out the deliverables, project inputs, final fee and any separate surveys or specialist work. Revision arrangements should also be confirmed in the quotation.
The typical preparation period is one to two weeks. The actual programme depends on scope, information availability and any required surveys. External review periods are separate.
LET’S REVIEW YOUR REQUIREMENTS
Send the site address, planning condition and available drawings. We’ll use your enquiry to establish the report scope and quotation.