(+44) 01223 926 335 Mon–Fri : 09:00 – 17:30
info@liongateconstruction.co.uk
(+44) 01223 926 335 Mon–Fri : 09:00 – 17:30
info@liongateconstruction.co.uk

REPORTING CONSULTANCY · UK COVERAGE

Tree Protection Plan (TPP)

Plan how retained trees will be protected during construction activity.

£750 + VATStarting price
1–2 weeksTypical preparation

Final scope, fee and programme are confirmed for your project.

OUR WORKLyonsdown Road ProjectTree Protection Plan (TPP) consultancy

UNDERSTAND YOUR REPORT

The detail behind
your next step.

Plan how retained trees will be protected during construction activity.

Discuss your project ↗

What is Tree Protection Plan (TPP)?

A Tree Protection Plan (TPP) is a scaled drawing and supporting document required by UK councils as a planning condition when development takes place near trees. Prepared in line with BS 5837, it shows the trees to be retained, their root protection areas, and the protective measures that will be used during the works — protective fencing, ground protection and working restrictions. Councils often ask for a TPP alongside an Arboricultural Method Statement, and wider landscape conditions may also require a Landscape and Ecological Management Plan (LEMP).

Who prepares this report?

At Liongate, we specialize in preparing Tree Protection Plans with a team of expert consultants. They efficiently handle the development of TPPs and skillfully manage the discharge of tree-related planning conditions set by councils. Our consultants, experienced in arboricultural planning and site logistics, ensure that each TPP meets the council’s requirements and keeps retained trees safe throughout the build.

FEE, PROGRAMME & COVERAGE

Know where
you stand.

A clear starting point for your report. Your quotation confirms the scope, final fee and preparation programme.

STARTING PRICE

£750 + VAT

The final fee reflects project complexity and the agreed requirements.

PREPARATION

1–2 weeks

Typical preparation, subject to the required project information. Any external review is separate.

COVERAGE

UK-wide

Consultants with experience supporting projects across UK council areas.

Send the project brief, relevant requirements and available drawings so the scope can be established.

Request your quotation

PROJECT EXPERIENCE

Lyonsdown Road Project

In the London Borough of Barnet, our team at Liongate prepared the Tree Protection Plan for the Lyonsdown Road scheme with Abacus Homes, alongside the site’s Demolition and Construction Management and Logistics Plan.

Protecting retained trees during demolition and construction takes real coordination between the arboricultural drawings and the site logistics — preparing both together kept the scheme’s conditions moving as one package.

Lyonsdown Road Project project viewLyonsdown Road Project project view

THE PEOPLE BEHIND THE REPORTS

Meet your team.

Engineering knowledge and practical project experience across the UK, with a team you can speak to.

Charlie Abdullah

Founder & Civil Engineer
Taha Kasal — Civil Engineer & Construction Consultant at Liongate

Taha Kasal

Civil Engineer & Construction Consultant

Kuzey Gargun

Intern Engineer
322Projects completed
UK-wideReporting consultancy
Since 2016UK-wide experience

BEFORE YOU START

A clear brief.
A clear quotation.

What should I send with my enquiry?

Share the site address, project description, relevant requirements and available drawings. Tell us about your target dates.

What does the starting fee cover?

The starting fee is a guide. Your quotation sets out the deliverables, project inputs, final fee and any separate surveys or specialist work. Revision arrangements should also be confirmed in the quotation.

How is the programme agreed?

The typical preparation period is one to two weeks. The actual programme depends on scope, information availability and any required surveys. External review periods are separate.

LET’S REVIEW YOUR REQUIREMENTS

Tell us about
your project.

Send the site address, planning condition and available drawings. We’ll use your enquiry to establish the report scope and quotation.