Construction phase planning to support the organisation of health and safety during the works.
Final scope, fee and programme are confirmed for your project.
UNDERSTAND YOUR REPORT
Construction phase planning to support the organisation of health and safety during the works.
A Construction Phase Plan (CPP) is required by the Construction (Design and Management) Regulations 2015 for every construction project in the UK — from a domestic extension to a major development. It records the health and safety arrangements for the construction phase: site rules, key risks and how they will be controlled, welfare arrangements and emergency procedures. Unlike the plans councils request through planning conditions, the CPP is a legal duty on every project regardless of planning. It is often confused with a Construction Management Plan — broadly, the CMP protects the neighbourhood for the council, while the CPP protects the people on site.
At Liongate, we specialize in preparing Construction Phase Plans with a team of expert consultants. They efficiently develop CDM 2015 documentation that reflects how the site will genuinely operate. Our consultants, experienced in construction planning and site safety, ensure that each CPP covers the key risks and arrangements, helping principal contractors and clients meet their legal duties with confidence.
FEE, PROGRAMME & COVERAGE
A clear starting point for your report. Your quotation confirms the scope, final fee and preparation programme.
STARTING PRICE
£750 + VAT
The final fee reflects project complexity and the agreed requirements.
PREPARATION
1–2 weeks
Typical preparation, subject to the required project information. Any external review is separate.
COVERAGE
UK-wide
Consultants with experience supporting projects across UK council areas.
Send the project brief, relevant requirements and available drawings so the scope can be established.
PROJECT EXPERIENCE
In South London, our team at Liongate prepared the Construction Phase Plan for the Alleyn Road scheme with Omni Form, setting out the health and safety arrangements for the construction phase in line with CDM 2015.
A clear, site-specific CPP is a legal requirement before works begin — and a well-written one doubles as a practical handbook for how the site actually runs day to day.


THE PEOPLE BEHIND THE REPORTS
Engineering knowledge and practical project experience across the UK, with a team you can speak to.
SELECTED REPORTING PROJECTS
BEFORE YOU START
Share the site address, project description, relevant requirements and available drawings. Tell us about your target dates.
The starting fee is a guide. Your quotation sets out the deliverables, project inputs, final fee and any separate surveys or specialist work. Revision arrangements should also be confirmed in the quotation.
The typical preparation period is one to two weeks. The actual programme depends on scope, information availability and any required surveys. External review periods are separate.